Coastal Resources, Inc
field field

Menu

Skip to content
  • Our Company
  • Capabilities
    • Environmental Assessments, Planning, Impact Analyses, and Documentation
    • Wetland Delineation and Functional Assessment
    • Permitting and Agency Coordination
    • Tree and Forest Conservation, Assessment, Planning, and Permitting
    • Sensitive Species Surveys
    • Tidal and Nontidal Water Quality and Biological Monitoring
    • Watershed Assessments
    • Wetland Mitigation and Monitoring
    • Stream Restoration and Geomorphic Assessments
    • Water Resources Engineering
    • Environmental Construction Inspection
    • Landscape Architecture
    • Geographic Information Systems (GIS) and Analysis
  • Projects
    • American Sugar Refinery BMP Landscape Plans
    • Arlington CP “RO” Access Road Landscape Conservation Plan
    • Best Management Protocols / Stormwater Management On-Call Support Services
    • Biological Monitoring and Assessment Program, Round 3
    • Bioswales Monitoring for ICC (Contract PB-C)
    • BWI Station and Fourth Track Project
    • Cabin John Watershed Assessment Update
    • Chesapeake Bay TMDL Implementation Plan – Permit Manager
    • Church to Steele 138 kV Transmission Line Rebuild
    • Dulles Corridor Metrorail Project Phase 2
    • Eastern Sanitary Landfill Solid Waste Management Facility – South Ditch Diversion Project
    • Environmental Compliance Construction Inspection for Electrical Transmission Improvement Projects
    • Environmental Monitoring Services for Sewer Rehabilitation and Stream Restoration
    • Exposed Pipe Protection and Stream Restoration, Rock Creek Basin – Phase II
    • Firehouse Chesapeake Bay Critical Area Mitigation Project
    • Floodplain Extension Mapping
    • Full-Delivery Stream Restoration Services for WIP TMDL Credits
    • Herring Bay, Middle Patuxent, and Lower Patuxent Watershed Assessment
    • Historical Tract Digitization and Methodology Development
    • I-495 & I-270 Managed Lanes Study
    • I-81 Mussel Translocation
    • I-95 Express Lanes Fredericksburg Extension Design-Build Project
    • ICC Design for Stream Restoration and Wetland Creation
    • Intercounty Connector (ICC) Planning & General Engineering Contract (GEC)
    • Kelly Branch Stream Restoration Targeted Biological Monitoring Support
    • Ken-Gar Palisades Park Wetland Creation
    • Keys Energy Center
    • Klingle Creek Stream Restoration for Klingle Valley Trail Project
    • Long Bridge Project, Environmental Impact Statement (EIS)
    • Marley Neck Forest Interior Dwelling Bird Survey
    • Marshyhope Creek Crossing
    • Masonville Cove Dredged Material Disposal Monitoring
    • MD 175/295 Interchange Project On-Site Mitigation Investigation and Design
    • MD 224 Rainbow Snake Inspection
    • MD 254 Over Neale Sound – Section 7 Consultation and EFH
    • MD 32 Design-Build from Linden Church Road to I-70 Stream and Wetland Mitigation
    • MD 4 Thomas Johnson Bridge Project Planning Study
    • MD 404 Construction, Environmental Compliance
    • MD 5 at Abell/Moakley Street Intersection Stream Relocation Project
    • MDOT SHA Environmental Analyst Consultant
    • Mid-Atlantic Power Pathway (MAPP)
    • Mitigation Banking Performance Standards Evaluation
    • MS4/TMDL Program Support – Tree Planting Planning and Implementation
    • New Nice/Middleton Bridge Replacement Project
    • NPDES Permit Monitoring and Inspection
    • Open End Mitigation Monitoring
    • Paint Branch Stream Restoration
    • Patapsco-Marley Creek Tidal Outfalls Feasibility Study
    • Pearce Creek Dredged Material Containment Facility – Benthic Community Monitoring for the Exterior Monitoring Program
    • Plum Tree Run Stream Restoration
    • Potomac River Combined Sewer Overflow Controls, Environmental Impact Statement (EIS)
    • Purple Line Study and General Engineering Consultants (GEC)
    • Rock Creek Park Trail Stream Restoration
    • Sanitary Sewer Design Services, BOA
    • Sanitary Sewer System Rehabilitation, Beaverdam Basin
    • Small Watershed Action Plans – Areas A, K, N, and B
    • Small Watershed Action Plans – Areas I, R, G, P, and Q
    • SR 1 Tybouts Corner to SR 273 Bog Turtle Phase 1 & 2 Surveys
    • Stream Restoration Design, Good Hope (ICC PB-119 Site)
    • Stream Restoration Design, Gum Springs (ICC PB-37 Site)
    • Stream Restoration Design, Indian Creek (ICC IC-62 Site)
    • Susquehanna River Bridge Reconstruction and Expansion Project
    • TMDL Non-Rooftop Disconnection Analysis
    • TMDL Stream Restoration of Little Tonoloway Creek at Kirkwood Park
    • TMDL Stream Restoration of Tributaries to Patapsco at West Nursery Road
    • TMDL SWM BMP Program Planning and Design
    • US 15 Project Planning Study
    • US 50 Severn River Bridge Preliminary Investigations
    • Vienna to Sharptown 69 kV Transmission Line
    • Watergate and Arnott Fen Restoration Projects
    • Water Resources Engineering for Watershed Management
    • Watershed Restoration Pre- and Post-Construction Restoration Effectiveness Monitoring
    • Wattsville to Kenney with Extension to Piney Grove 69 kV Transmission Line Rebuild
    • Wetland Mitigation Design, Great Seneca Creek Floodplain (ICC SC-19 Site)
    • Wetland Mitigation Design, Right Fork (ICC PB-1 Site)
    • White Marsh Run Stream Restoration and Sanitary Sewer Stabilization
    • Wildlife Mortality Mitigation Analysis and Geodatabase
    • Worcester to Ocean City 6724 Line Rebuild-Underground
  • Staff
    • Natural Resources Team
    • Sarah A. Williamson
    • Bridgette J. Garner
    • Sean Sipple, PWS, PWD
    • Heather Tatone, PWS
    • David R. Smith, PWS
    • Megan Niehaus, PWS
    • Emily Murrell
    • Kevin Stohlgren
    • Jeff Gring
    • Lilly Edmond
    • Amanda Cruz
    • Vince Edwards
    • Lindsey Nolan
    • Emma Beck
    • Shannon Pursell
    • Water Resources Team
    • Michele J. Floam, LLA
    • Katie Scott, PE
    • J. Ashby Strassburger
    • Sarah Norton, PE
    • Matthew Drennan, LEED AP BD+C
    • Jon Stewart
    • Cal Novelli, EIT
    • Samuel Jacobson
    • William Brown
  • Openings
  • Kudos
  • Contact Us

Job Openings

Coastal Resources is currently seeking to fill the following positions.  Click on links below for job description and instructions to apply.

  • Environmental Construction/Compliance Inspector

 

Excellence and Leadership

For 40 years, Coastal Resources has set a standard of excellence in providing natural resources management services.

Learn more.

Featured Project

Sanitary Sewer Design Services, BOA

Client Washington Suburban Sanitary Commission (WSSC) Key Services GIS Data…

Learn more.

  • Our Company
  • Capabilities
  • Projects
  • Staff
  • Openings
  • Kudos
  • Contact Us