- American Sugar Refinery BMP Landscape Plans
- Arlington CP “RO” Access Road Landscape Conservation Plan
- Best Management Protocols / Stormwater Management On-Call Support Services
- Biological Monitoring and Assessment Program, Round 3
- Bioswales Monitoring for ICC (Contract PB-C)
- BWI Station and Fourth Track Project
- Cabin John Watershed Assessment Update
- Chesapeake Bay TMDL Implementation Plan – Permit Manager
- Church to Steele 138 kV Transmission Line Rebuild
- Dulles Corridor Metrorail Project Phase 2
- Eastern Sanitary Landfill Solid Waste Management Facility – South Ditch Diversion Project
- Environmental Compliance Construction Inspection for Electrical Transmission Improvement Projects
- Environmental Monitoring Services for Sewer Rehabilitation and Stream Restoration
- Exposed Pipe Protection and Stream Restoration, Rock Creek Basin – Phase II
- Firehouse Chesapeake Bay Critical Area Mitigation Project
- Floodplain Extension Mapping
- Full-Delivery Stream Restoration Services for WIP TMDL Credits
- Gwynns Falls Watershed Study
- Hampstead Bypass
- Herring Bay, Middle Patuxent, and Lower Patuxent Watershed Assessment
- Historical Tract Digitization and Methodology Development
- I-495 & I-270 Managed Lanes Study
- I-81 Mussel Translocation
- I-95 Express Lanes Fredericksburg Extension Design-Build Project
- Intercounty Connector (ICC) Planning & General Engineering Contract (GEC)
- Kelly Branch Stream Restoration Targeted Biological Monitoring Support
- Ken-Gar Palisades Park Wetland Creation
- Keys Energy Center
- Klingle Creek Stream Restoration for Klingle Valley Trail Project
- Long Bridge Project, Environmental Impact Statement (EIS)
- Lower Gunpowder Watershed Study
- Marley Neck Forest Interior Dwelling Bird Survey
- Marshyhope Creek Crossing
- Masonville Cove Dredged Material Disposal Monitoring
- MD 175/295 Interchange Project On-Site Mitigation Investigation and Design
- MD 224 Rainbow Snake Inspection
- MD 254 Over Neale Sound – Section 7 Consultation and EFH
- MD 32 Design-Build from Linden Church Road to I-70 Stream and Wetland Mitigation
- MD 4 Thomas Johnson Bridge Project Planning Study
- MD 404 Construction, Environmental Compliance
- MD 5 at Abell/Moakley Street Intersection Stream Relocation Project
- MDOT SHA Environmental Analyst Consultant
- Mid-Atlantic Power Pathway (MAPP)
- Mitigation Banking Performance Standards Evaluation
- MS4/TMDL Program Support – Tree Planting Planning and Implementation
- New Nice/Middleton Bridge Replacement Project
- NPDES Permit Monitoring and Inspection
- Open End Mitigation Monitoring
- Paint Branch Stream Restoration
- Patapsco-Marley Creek Tidal Outfalls Feasibility Study
- Pearce Creek Dredged Material Containment Facility – Benthic Community Monitoring for the Exterior Monitoring Program
- Plum Tree Run Stream Restoration
- Potomac River Combined Sewer Overflow Controls, Environmental Impact Statement (EIS)
- Purple Line Study and General Engineering Consultants (GEC)
- Rock Creek Park Trail Stream Restoration
- Sanitary Sewer Design Services, BOA
- Sanitary Sewer System Rehabilitation, Beaverdam Basin
- Small Watershed Action Plans – Areas I, R, G, P, and Q
- Small Watershed Action Plans – Areas A, K, N, and B
- SR 1 Tybouts Corner to SR 273 Bog Turtle Phase 1 & 2 Surveys
- Stream Restoration Design, Good Hope (ICC PB-119 Site)
- Stream Restoration Design, Gum Springs (ICC PB-37 Site)
- Stream Restoration Design, Indian Creek (ICC IC-62 Site)
- Susquehanna River Bridge Reconstruction and Expansion Project
- TMDL Non-Rooftop Disconnection Analysis
- TMDL Stream Restoration of Little Tonoloway Creek at Kirkwood Park
- TMDL Stream Restoration of Tributaries to Patapsco at West Nursery Road
- TMDL SWM BMP Program Planning and Design
- US 15 Project Planning Study
- US 50 Severn River Bridge Preliminary Investigations
- Vienna to Sharptown 69 kV Transmission Line
- Water Resources Engineering for Watershed Management
- Watergate and Arnott Fen Restoration Projects
- Watershed Restoration Pre- and Post-Construction Restoration Effectiveness Monitoring
- Wattsville to Kenney with Extension to Piney Grove 69 kV Transmission Line Rebuild
- Wetland Mitigation Design, Great Seneca Creek Floodplain (ICC SC-19 Site)
- Wetland Mitigation Design, Right Fork (ICC PB-1 Site)
- White Marsh Run Stream Restoration and Sanitary Sewer Stabilization
- Wildlife Mortality Mitigation Analysis and Geodatabase
- Worcester to Ocean City 6724 Line Rebuild-Underground