Reference

Robert Shreeve, Environmental Manager, 410-545-8644

Maryland State Highway Administration – Environmental Programs Division

Project Highlights

  • NEPA Documentation (NETR, DEIS, FEIS, ROD)
  • Permitting
  • Water Quality Sampling
  • Mitigation
  • Environmental Management
  • Environmental Construction Inspection
  • Manage ES/CM/CS Projects
  • Design for Stream Restoration and Wetland Creation

Project Details

ICC WetlandThis mega project ($2.6 billion) includes the construction of a controlled access, 18 mile multi-modal roadway linking I-270 and I-95/US 1. Coastal Resources, Inc. (CRI) was a key consultant on natural resources during the planning-NEPA-permitting-mitigation process and was the Environmental Manager during Design and Construction of the mainline and the compensatory mitigation (CM) and environmental stewardship (ES) projects.

During planning, CRI researched, gathered, analyzed and summarized existing data on water quality, watershed characteristics, reservoirs, geomorphology, fisheries, brown trout, and wetlands within the study area watersheds. CRI conducted extensive field studies including chemical and temperature sampling, macroinvertebrate and fish sampling, and geomorphic assessments to supplement the existing information on the streams. Geomorphic assessments of existing stream conditions were conducted at 40 stream reaches.  Data were analyzed, and the bankfull geometry, hydraulic characteristics, Rosgen stream classification, and stream stability of each reach were evaluated.  In addition, over 100 acres of wetlands, and over eight miles of streams were mapped within the study corridors. Functional assessments were completed for each wetland using the New England Method.  CRI led field reviews of wetland/waterway boundaries, obtained a jurisdictional determination, and led the Clean Water Act (CWA) permitting process with state and federal regulatory and resource agencies.  CRI summarized the NETR for the Draft Environmental Impact Statement (DEIS), addressed agency and public comments, and compiled updated information for the Final Environmental Impact Statement (FEIS). CRI participated in numerous community meetings and provided displays to inform and educate the public.   An extensive mitigation site search was conducted for unavoidable impacts to wetlands and streams (40-57 acres of wetlands and 25,000-37,000 linear feet of stream) as well as ES opportunities within the affected watersheds.  A mitigation database was created documenting existing mitigation site searches and applied a ranking system to prioritize the hundreds of sites investigated. CRI provided agency field tours, meeting minutes, and obtained agency concurrence on CM and ES packages for each planning alternate. CRI was also responsible for the creation and management of the Record of Decision (ROD)/permit special conditions tracking database used to track environmental compliance of the mainline and the ES/CM projects.

As lead of the Environmental Management Team during construction, CRI manages and/or executes a wide range of environmental compliance/review and permitting, while also conducting technical assessments for the mainline construction, along with design management and monitoring for ES/CM projects. CRI led all Reforestation Law permitting activities for the mainline, and prepared NEPA re-evaluation documentation, CWA permit modifications, and Forest Conservation Act compliance documents/permits for all highway design changes and ES/CM projects.  CRI conducted natural resource inventories such as wetland delineations, forest characterizations, large tree surveys, and habitat and RTE assessments at each mitigation site. All resources were documented, surveyed, and mapped in GIS and CADD.

ICC box turtleCRI coordinated with SHA, the Box Turtle Advisory Group and the Design Build contractors to devise and implement a plan for removing box turtles from the alignment before construction. Turtles, within the limits of disturbance, were relocated to M-NCPPC approved off-site locations.  A final report was prepared documenting the numbers of box turtles relocated (totaling over 900) from each contract segment, outlining best practices used in the conservation of box turtles during construction.

CRI managed the design and construction of 52 ES/CM projects including providing design review and environmental construction inspection.  CRI is conducting pre- and post-construction biological sampling up and downstream of the ICC at 20 stream crossings to assess water quality before and after construction.  Biological sampling is also being conducted at 21 of the ES/CM sites before and after construction to measure overall success of the projects in improving water quality and aquatic conditions.  The results of monitoring were compiled into technical reports detailing methodologies and results.

CRI also provided complete design and permitting services for four stream restoration sites and two wetland mitigation sites as part of the ES/CM package for the ICC Project (PB-37, PB-8/108, PB-119, IC-62, PB-1, & SC-19).  For more detailed descriptions of these projects, click the following links:

ICC Design for Stream Restoration and Wetland Creation

Stream Restoration Design, Good Hope (ICC PB-119 Site)

Stream Restoration Design, Gum Springs (ICC PB-37 Site)

Stream Restoration Design, Indian Creek (ICC IC-62 Site)

Wetland Mitigation Design, Great Seneca Creek Floodplain (ICC SC-19 Site)

Wetland Mitigation Design, Right Fork (ICC PB-1 Site)

Bioswales Monitoring for ICC (Contract PB-C)