Coastal Resources, Inc. engineers and scientists routinely assess stability of streams and provide full-service stream restoration design services with an emphasis on natural solutions and functional uplift. Our team of highly trained staff is experienced in both the Coastal Plain and Piedmont physiographic regions. CRI tailors each design to accommodate site specific constraints and client needs. CRI staff hold Professional Engineer (PE) licenses in Delaware, Maryland, Pennsylvania, Virginia, West Virginia, and the District of Columbia, as well as Landscape Architect (LA) licenses in Maryland and Virginia and Rosgen level I-IV training certifications. Service Sheet Contact Us Our in-depth stream restoration services include: Geomorphic Assessment Surveys and Bank Stability StudiesStream Restoration and Relocation Assessment and DesignPre- and Post-Construction Stream MonitoringFunctional Uplift EvaluationSoil Bulk Density SamplingHydrologic and Hydraulic Modeling for Stream Restoration DesignFish Passage Assessment and MitigationWatershed Study and AssessmentHEC-RAS 2D ModelingLandscape Design for Stream RestorationCompensatory Stream Mitigation Site SearchesIn-Stream Structure Stabilization AssessmentsTMDL Pollutant Reduction Load Estimates Representative Projects 49th and Fulton Stream Restoration, Stream/Culvert Investigation and Design Washington, DC Haskell Drive Stream Bank Stabilization Project Monitoring Anne Arundel County, MD I-495 I-270 Managed Lanes Study CA-5 (Unnamed Tributary to Great Seneca Creek) Stream Restoration Mitigation Montgomery County, MD MD 175/295 Interchange Project On-Site Mitigation Investigation and Design Anne Arundel County, MD MD 32 Design-Build from Linden Church Road to I-70 Stream and Wetland Mitigation Howard County, MD Paint Branch Stream Restoration Prince George’s County, MD Windmill Branch (Bridge Street) Stream Restoration Project Town of Easton, MD